SEARCH
ARCHIVE · SPACE

The final count: Endeavour and what's left

BY GERARDO BLANCO · · 4 MIN
KOSMOSLOGOS ARCHIVEAutomatic translation of the original Spanish post by Gerardo Blanco (KosmosLogos, CC BY-SA 3.0). Read the original in Spanish. /2009/07/la-cuenta-final-el-endeavour-y-lo-que.html

For today, Saturday, the launch of the space shuttle Endeavour is planned, the third flight this year, and one of the eight missions before NASA mothballs its space taxi next year.

Endeavour on Launch Pad

This Saturday the launch is planned for 7:39 p.m. EDT (2339 GMT) from the Kennedy Space Center in Florida. It will be mission 127 of the space shuttle, which has flown since 1981.

NASA plans to retire Endeavour, as well as its ships Atlantis and Discovery in 2010, after completing the construction of the International Space Station (ISS). Its replacement, the Orion capsule and the Ares I rocket would not be ready until 2015. The agency currently plans to carry astronauts on the Russian Soyuz vehicles, although other options are being considered.

The United States Space Agency gives us a glimpse of the last eight missions for the world's only reusable space vehicles:

8) STS-127: An international mission

Endeavour's mission to the ISS was delayed from mid-June by a hydrogen leak that prevented two launches. The leak was repaired and it is hoped that this Saturday the mission that will complete the Japanese laboratory Kibo can be launched, although the weather does not seem to help. In addition, new batteries for the solar panels and a replacement for the cooling system will be carried.

The six members of the ISS

The mission is the first since the station doubled the number of crew members to six, for the first time, on May 29. The new members were Frank de Winne (Belgian), Roman Romanenko (Russian) and Robert Thirsk (Canadian). The three who were already there are Gennady Padalka (Russia), Michael Barratt (USA) and Koichi Wakata (Japan).

The mission will also replace a crew member: Koichi Wakata will return home and in his place will be Tim Kopra.

7) STS-128: Preparing for science

COLBERT logo

Discovery will carry the COLBERT treadmill, which became popular because NASA conducted a publicity campaign for the public to name a new node (Node 3). The American comedian who hosts the show "The Colbert Report" urged his fans to name it "COLBERT". The Node was finally named "Tranquility", but the comedian got his name anyway on a new treadmill that will keep astronauts in shape. It will be installed in the "Tranquility" node when it arrives.

The mission, which will include three spacewalks, will carry astronaut José Hernández (Californian, son of Mexicans) who is counting down the preparations through his Twitter account.

Two research racks will be sent, one to conduct experiments on various materials such as metals, glass, crystals and ceramics, to learn how materials mix and solidify outside Earth's gravity. The other rack will be for fluid research. To store the fruits of their labor, Discovery will carry a freezer, known as MELFI.

Vehicle: Discovery
Planned launch date: August 18

6) STS-129: Spare parts to space

Veteran Charlie Hobaugh will lead Atlantis, which will carry many spare parts to the ISS. Since the new Orion spacecraft is somewhat small to carry the large parts needed for the ISS, the agencies involved are trying to build up a stock of spare parts before the shuttles retire.

Vehicle: Atlantis
Planned launch date: November 12

5) STS-130: A room with a view

Simulation of Earth view from Tranquility

The first flight of 2010 will carry Node 3, the last one, called "Tranquility", which will provide the ISS crew with more space and large windows. It is also called "cupola" due to the shape of the node with its seven windows.
Here the COLBERT treadmill will be installed.

Vehicle: Endeavour
Planned launch date: February 4, 2010

4) STS-131: Experiments in orbit

Captain Alan Poindexter will lead this mission that will carry a research platform ("window observational research facility") that will add cameras and sensors to monitor climate changes on our planet. A system called MARES will also be carried, designed to study how astronauts' bodies change, by measuring changes in bone and muscle strength over time.

Vehicle: Discovery
Planned launch date: March 18, 2010

3) STS-132: The final touches

The last mission of Atlantis, its 32nd flight, will carry a new Russian room (MRM-1) and a European robotic arm.

Vehicle: Atlantis
Planned launch date: May 14, 2010

2) STS-133: And more spare parts

The last flight of Endeavour, its 25th mission, will carry more spare parts to the ISS.
Parts for the Canadian robot Dextre and the Russian module Zvezda will also be sent.

Vehicle: Endeavour
Planned launch date: July 29

1) STS-134: The million-dollar experiment

This extra mission will carry a spectrometer (Alpha Magnetic Spectrometer), long awaited since its shipment was postponed after the Columbia disaster. The massive spectrometer is valued at 1.5 billion dollars and weighs 7 tons, designed to detect cosmic rays and measure their charge, momentum and velocity.

Flight number 39 of Discovery will mark the end of the construction of the ISS, begun in 1998 with the launch of the Russian module Zarya.

Vehicle: Discovery
Planned launch date: September 16

Sources and related links

About the images

Storm clouds approach launch pad 39A at the Kennedy Space Center on Friday as Endeavour waits.
Credit: NASA TV

COLBERT treadmill logo.
Credit: NASA

Window of Node 3 Tranquility simulating a view of Earth.
Credit: NASA

Expedition 20 - the first six-member crew of the ISS, gathered in the Zvezda module.
Credit: ESA

KOSMOSLOGOS ARCHIVEOriginally published on KosmosLogos by Gerardo Blanco · License CC BY-SA 3.0 · Adapted format, original text unchanged
GERARDO BLANCOAuthor of the KosmosLogos blog, written from Argentina about astronomy, astrophysics, cosmology, and related sciences.

RELATED

SPACE