A gas leak in the fuel system will delay the launch by at least 96 hours. There is a conflict with another launch scheduled for the 17th.

NASA postponed the shuttle launch to the International Space Station due to a leak associated with hydrogen gas in the fuel tank venting system that is used to safely carry excess hydrogen away from the launch platform.
The earliest it could be launched would be the 17th. However, there is a conflict with the scheduled launch of LCROSS. A meeting will be held soon (2pm EDT Sunday) to discuss the options and a press conference on NASA TV.
The 16-day mission will have 5 spacewalks and complete the construction of the Japanese Kibo laboratory. Commander Mark Polansky will keep us informed about STS-127 through his Twitter channel.
Sources and related links
- NASA Postpones Launch of Space Shuttle Endeavour
About the images
Credit: NASA


